FPSO Training Course

FPSO Training Course

FPSO Training Course key topics include:

  • FPSO design and technology
  • Technical building blocks
  • Importance of building safety into the FPSO concept
  • Contracting strategy
  • Hull structure, design and maintenance
  • Legal complexities
  • Selection and design of mooring and risers systems
  • Offshore loading considerations
  • Integrity management and life extension

Course Outline

  • Course introduction and objectives
  • Market overview
    • Introduction to floating production systems
    • Market forecasts
    • FPSO strengths and weaknesses
    • FPSO complexity
  • Introduction to FPSO design and technology [part 1]
    • Introduction to FPSO technology
    • FPSO role
    • FPSO key components
    • Terminology
    • Alternative lay-out configurations
    • Alternative mooring configurations
    • New developments
  • Strategy and commercial considerations
    • Developing an execution and contracting strategy
    • Strategic options and alternatives

    – Procurement options: lease and EPC strategies

    – Select and define options: engineering and procurement options

    – Execute options: detailed design and construction

    – Alternatives: redeployment of existing facilities

    • The market place
    • Management of risk
  • Strategy Development
  • Safety issues for FPSO projects
    • Safety conception
    • Using formal safety assessment in FPSO design
    • Safety engineering activities
    • Building safety into the FPSO concept
    • Potential FPSO hazards and safety design issues
  • Introduction to FPSO design and technology [part 2]
    • Introduction to FPSO design
    • Newbuild or conversion?
    • Initial hull sizing (new build)
    • The design spiral
  • Fuel, heat, power and gas strategies
    • Gas handling
    • Dual fuel strategy
    • Power and heat requirements
    • Driver strategy
    • Process heat strategy
  • Design issues for FPSO topsides
    • Offshore hydrocarbon processing:
    • Process flowsheet and equipment
    • What’s different on an FPSO
  • Offshore loading
    • 24 hrs dynamic positioning (DP) operations within defined weather criteria
    • Bow loading principle
    • Safety systems; ‘Green line’ principle
    • Principles of the tailor made ‘tandem loading’ software
    • Competence requirement for DP operators and the competence assurance programme
    • Vessel flexibility
    • Taut hawser bow loading principle
    • Limitations in environmental / operation criteria compared to DP operation
    • Single position reference system versus taut hawser operation
  • FPSO topsides layout
    • Context
    • Temporary refuge and escape
    • Modularisation
    • Module and topside layout
    • Equipment layout within modules
    • Topsides weights
  • Develop an FPSO layout 
  • Environmental concerns and related design issues
    • Metocean impact on HVAC design
    • Wind chill, green water and icing
    • Exhaust dispersion
    • Flaring and cold vents
    • Environmental and operational threats
  • FPSO turrets and swivels
    • Key technologies
    • Different turret types
    • Interface with subsea
    • CALM buoys
    • What is going on inside a swivel?
  • Regulatory issues, class, regional requirements & verification activities
  • Legal considerations for FPSO projects
    • Design and construction risk
    • Installation and commissioning
    • FPSO operating agreements
  • FPSO hull structure, design and maintenance
    • Introduction
    • Newbuild and conversions – examples of both
    • Global hull loading
    • (Other) Site specific loads
    • Structural assessment
    • Structural fatigue
    • Lessons learnt and in-service incidents
  • Integrity management and life extension strategies for FPSOs
    • Identifying the risks – integrity issues leading to commercial impacts
    • Common problem areas
    • Inspection techniques
    • Condition monitoring
    • Managing coatings through the life time of an FPSO
    • Developing a robust IM strategy
  • Risk Analysis
  • Key regional differences and trends
  • FPSO conversion experience
    • Developing a conversion strategy
    • Vessel selection & inspection
    • Scope definition
    • Conversion activities
    • Lessons learned and key success factors
  • Risers and mooring systems
    • Floating production systems
    • Anchoring and mooring systems
    • Riser systems
    • Summary and conclusions
  • FPSO commissioning: Getting it done on time
  • Preparations for start-up and effective operations
  • Effective commissioning and start-up
  • FPSO field installation
    • Management and planning for installation
    • Safety
    • Anchor and mooring installation
    • Riser installation
    • FPSO installation and hook-up

 

FACILITIES

  • Certificate, Quality Training Kit (Pencil case: Erase, Bolpoint, Pencil, Tipe X, Stabillo, Flash Disk 8 GB
  • Bag
  • Training Material (Hand Out & Soft Copy)
  • Convenient training facilities in stars hotel (Public Training)
  • Souvenir
  • Antar Jemput Bandara (Yogyakarta , Bali dan Bandung)

 

Permintaan Brosur penawaran Training ( Waktu dan Tempat) silahkan Menghubungi kami

Catatan :

  • Pelatihan ini dapat di-customized sesuai kebutuhan perusahaan Anda bila diselenggarakan dalam bentuk In-House Training. Untuk permintaan In-House Training dengan jenis topik lainya, silahkan mengirimkan ke alamat email yang tercantum di web kami.
  • Request Training. Jika anda membutuhkan informasi pelatihan yang belum tercantum pada website ini, atau anda ingin memberikan usulan materi yang sesuai dengan tingkat kebutuhan perusahaan anda, silahkan mengirimkan ke alamat email yang tercantum.
  • Bila tidak ada tanggal dan waktu atau yang tercantum sudah kadaluarsa didalam artikel mohon tanyakan kepada kami untuk jadwal terbarunya.

 

Lokasi Training Pilihan : di Yogyakarta, Jakarta, Bandung, Bogor, Surabaya, Malang, Bali, Lombok, Balikpapan, Makassar, Medan, Batam, Riau, Pontianak, Semarang, Solo, Manadodan Kota-kota lainnya  (dengan harga dan minimal kuota yang berbeda)